← All projects

Estate & probate

Whole-home cleanup, paint and repairs, inside and out

Interior cleanup, a re-tiled bathroom, fresh paint inside and out, and a refreshed deck, entry and yard.

Property details

  • 3 bed, 2 bath, 1,480 sq ft
  • Taken from an estimated $580k to a sale of $650k
  • $20,000 time and materials
  • 6 weeks working time

Project highlights

  • Interior cleanup, dumpster drop, yard sale
  • Common bath demo, tub re-tile, fixtures, floor and cabinet repair
  • Smoker's room scrubbed, sealed, primed and painted
  • All bedrooms primed and painted
  • Master bath cleaned, painted, vanity and fixtures
  • Prep and repaint deck
  • Scraped, brushed, pressure washed, color matched, masked and sprayed exterior
  • Pressure washed all concrete surfaces, yard maintenance, bark
  • Removed outdated cable and wire
  • Windows washed and cleaned

Entry

Front entry with a green door, repainted siding, large windows and a freshly mulched bed After
Side of the house with a weathered tan wall, large windows and an overgrown planting bed before the work Before

Garage

Cleared garage with exposed wall framing, a door and an insulated water heater After
Garage full of stored items, a blue tarp, buckets and shelving before cleanout Before

Living room

Cleared living area with a brick fireplace, hardwood floor and a wall of windows onto the trees After
Living area cluttered with furniture, a dining table and boxes before the work Before

Bedroom

Empty bedroom with fresh white walls, wood paneling, a clerestory window and clean carpet After
Bedroom with carpet, a cluttered bed, a dresser and a television before the work Before

Bathroom

Remodeled tub and shower with large marble-look tile, a new shower fixture and new flooring After
Bathtub with worn tile surround and outdated fixtures before renovation Before
BeforeTub tile was in bad shape, bench rotted, outdated floor tile, toilet inoperable, fixtures falling off, paint needed.
AfterNew LVP flooring, new tile shower, fixtures, toilet, caulk, paint and clean.

Exterior

Painter prepping the exterior siding beside a green door and a railing In progress

Scraped, brushed, pressure washed, color matched, masked and sprayed exterior.

Deck

Freshly repainted red deck with a horizontal-slat railing surrounded by trees After

Prep and repaint deck.

Planning a project of your own?